You don't have javascript enabled. Good luck with that.
Pencarian
 Serapan Anggaran Dinas PJE Ditargetkan 84,6 Persen.

Industry and Energy Agency’s Budget Realization Reaches 84.6 Percent

Jakarta Dept. of Industry and Energy’s budget realization has reached 84.6 percent out of total budget Rp 1.3 trillion this year.

Lamp replacement budget is Rp 774 billion. The replacement is still running now

Yuli Hartono, agency’s head, admitted the budget is mostly used to instal 89 thousands of LED lamp for street lights in Central Jakarta, South Jakarta, and North Jakarta.

“Lamp replacement budget is Rp 774 billion. The replacement is still running now,” he admitted, Friday (11/25).

Smart System LED Installation Reaches 73 Percent

According to him, the lamp replacement must be run since his agency has bought the components. Personnel keep replacing the lamp everyday from sub-district to city levels.

His side will remain focus in replacing street light lamp with smart system LED next year. As planned before, 125 thousands spot will be replaced by spending Rp 1.5 trillion.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye358 personAldi Geri Lumban Tobing
  5. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye358 personDessy Suciati
close