You don't have javascript enabled. Good luck with that.
Pencarian
 Serapan Anggaran Dinas PJE Ditargetkan 84,6 Persen.

Industry and Energy Agency’s Budget Realization Reaches 84.6 Percent

Jakarta Dept. of Industry and Energy’s budget realization has reached 84.6 percent out of total budget Rp 1.3 trillion this year.

Lamp replacement budget is Rp 774 billion. The replacement is still running now

Yuli Hartono, agency’s head, admitted the budget is mostly used to instal 89 thousands of LED lamp for street lights in Central Jakarta, South Jakarta, and North Jakarta.

“Lamp replacement budget is Rp 774 billion. The replacement is still running now,” he admitted, Friday (11/25).

Smart System LED Installation Reaches 73 Percent

According to him, the lamp replacement must be run since his agency has bought the components. Personnel keep replacing the lamp everyday from sub-district to city levels.

His side will remain focus in replacing street light lamp with smart system LED next year. As planned before, 125 thousands spot will be replaced by spending Rp 1.5 trillion.

Linked News
Popular News indeks
  1. Rano Reaffirms Jakarta's Vision of Becoming a City of Cinema

    access_time22-10-2026 remove_red_eye5536 personBudhi Firmansyah Surapati
  2. Drainage Channels Along Two Rawajati Roads Dredged

    access_time21-10-2026 remove_red_eye1867 personTiyo Surya Sakti
  3. Check Saturday's Traffic Diversions for Jakarta Running Festival

    access_time23-10-2026 remove_red_eye870 personAldi Geri Lumban Tobing
  4. MRT Jakarta Prolongs Weekend Service for Kanye West Concert

    access_time23-10-2026 remove_red_eye770 personAldi Geri Lumban Tobing
  5. MRT Jakarta Modifies Schedule for Jakarta Running Festival

    access_time23-10-2026 remove_red_eye738 personAldi Geri Lumban Tobing